
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
LATEST POSTS
- 1
Boats escort freed whale away from shallow waters off German coast - 2
Jenny & Dave Marrs Mourn Loss of Former ‘Fixer to Fabulous: Italiano’ Guest - 3
Figure out How to Track and Anticipate Future Cd Rates - 4
Sound Propensities: 20 Methods for helping Your Insusceptible Framework - 5
Europe's powerful Ariane 6 rocket launches Sentinel-1D Earth-observation satellite to orbit (video)
'All Her Fault' ending explained: The shocking conclusion to the psychological thriller inspired by true events
The Fate of Rest: Patterns in Shrewd Beds
Vote in favor of your Favored Kind of Scarf
Figure out How to Modify Your Pre-assembled Home for Greatest Solace and Stylish Allure
Surveys of Thrillers That Re-imagined the Class
Flourishing as a Charitable Pioneer: Individual Encounters in Generosity
Study reveals links between global food systems, obesity, and climate change
10 Demonstrated Systems to Develop Your Internet based Business
Russia accidentally destroys its only way of sending astronauts to space













